A home-built tension box came with this loom. Half inch oak plywood sides are joined by 3/4″ (i.d.) galvanized pipe. The pipe is secured by driving in the nuts from 1/2″ bolts into the ends of the pipe and then secured to the plywood from the outside with 1/2″ bolts and washers (1/2″ nuts have a diametre slightly larger than 3/4″). There are eight pipes on the top level and two on the lower level and mounts for reeds at either end. It is well built. Today I disassembled it and cleaned it, steel wooling the pipe, sanding all wood, and routing a finished edge onto the plywood. Then I oiled it with linseed oil. I will give some thought to what sort of legs I want on it. I am very pleased with this result…
Advertisements